The accomplished team at Ranjy Construction & Foundation Limited designed and constructed Dangote Quay Lekki – Charlie & Delta, which is an “Inner Port” Jetty Concept.
Dangote Quay Lekki – Charlie & Delta is 440 meters long with a 14.5-meter draft designed to handle 2 berths (C & D) at a time with a Concrete Secant Piles Wall, Bearing Piles, Contiguous Piles, Concrete Platforms and a Fenders and Bollards System. We proficiently installed the system in just 12 months.
Using 70,000 cubic meters of concrete, 7000 tons of reinforcement, and 5 rigs, our team of designers and engineers produced a flawless end result withstanding weight, weather, and time for an impeccable finished product, which humbly stands in Lekki, Nigeria under the ownership of Dangote Group.
CFA Piles 800mm Diameter |
Bored Piles 1200mm & 1500mm Diameter |
Secant Piles 880 mm Diameter |
|
Number of Piles | 248 | 784 | 569 |
Length of each Pile | 21 | 31 | 18 |
Concrete used for the Project | 70000 m3 | ||
Reinforcement used for the Project | 7000 tons | ||
Number of Rigs on Site | 5 Rigs | ||
Completion Period | 12 Months |