Dangote Quay Lekki – Charlie & Delta (DFJ)

The accomplished team at Ranjy Construction & Foundation Limited designed and constructed Dangote Quay Lekki – Charlie & Delta, which is an “Inner Port” Jetty Concept. 

Dangote Quay Lekki – Charlie & Delta is 440 meters long with a 14.5-meter draft designed to handle 2 berths (C & D) at a time with a Concrete Secant Piles Wall, Bearing Piles, Contiguous Piles, Concrete Platforms and a Fenders and Bollards System. We proficiently installed the  system in just 12 months.

Using 70,000 cubic meters of concrete, 7000 tons of reinforcement, and 5 rigs, our team of designers and engineers produced a flawless end result withstanding weight, weather, and time for an impeccable finished product, which humbly stands in Lekki, Nigeria under the ownership of Dangote Group.

 

CFA Piles 800mm Diameter

Bored Piles 1200mm & 1500mm Diameter

Secant Piles 880 mm Diameter

Number of Piles 248 784 569
Length of each Pile 21 31 18
Concrete used for the Project 70000 m3    
Reinforcement used for the Project 7000 tons    
Number of Rigs on Site 5 Rigs    
Completion Period 12 Months